Rosatom Brings Unit 1 Leningrad II Minimum Controlled Power
Russian engineering and construction giant Rosatom announced that the Unit 1 of Generation III+ VVER-1200 reactor at Leningrad Phase II was brought up to the minimum controlled power (MCP) Tuesday.(read more)