The Burlington Lift Bridge will have lane reductions from March 5 to March 8 for repair work. The lane reductions will be in place from 9 a.m. to 3 p.m. in both directions. There will be a lane open in both directions at all times. There will be no lane reductions during peak times to help minimize disruption. The bridge will remain open to cyclists and pedestrians.