Article 4HK57 Cannon Street repaving “lull” coming — but project that closed popular bike lanes should be done early

Cannon Street repaving “lull” coming — but project that closed popular bike lanes should be done early

by
from on (#4HK57)
B88758377Z.1_20190620115143_000_GE5KN962

Repaving can move ahead faster because road base is in better shape than expected. The painful reconstruction project was originally slated to run into October.

External Content
Source RSS or Atom Feed
Feed Location http://rss.metroland.com/9/article/hamilton
Feed Title
Feed Link http://rss.metroland.com/
Reply 0 comments