Cannon Street repaving “lull” coming — but project that closed popular bike lanes should be done early
by from on (#4HK57)
![B88758377Z.1_20190620115143_000_GE5KN962](http://media.zuza.com/1/7/1718e4ac-95dc-4b26-8e69-b830692c40fc/B88758377Z.1_20190620115143_000_GE5KN962.3-0_Content.jpg)
Repaving can move ahead faster because road base is in better shape than expected. The painful reconstruction project was originally slated to run into October.