Leningrad Unit 6 Sustains Minimum Power
The final stage of the physical launch for the newest VVER-1200 6th power block has been launched at the Leningrad NPP. This is the first time the unit, also designated as Leningrad II Unit 2, has reached the minimum controllable power.(read more)