Viking Link: The Epic Build of the World’s Longest Onshore and Subsea HVDC Interconnector
by Sonal Patel from POWER Magazine on (#6PNB3)
A marvel of modern engineering, Viking Link-the world's longest onshore and subsea interconnector-began commercial operations in December 2023. The project garners POWER's inaugural Transmission and
The post Viking Link: The Epic Build of the World's Longest Onshore and Subsea HVDC Interconnector appeared first on POWER Magazine.