Article 717N9 Amazon Builds First Solo Subsea Cable Linking Maryland To Ireland

Amazon Builds First Solo Subsea Cable Linking Maryland To Ireland

by
msmash
from Slashdot on (#717N9)
AWS today announced Fastnet, a subsea fiber-optic cable that will link Maryland's Eastern Shore to County Cork, Ireland. The project marks Amazon's first wholly-owned subsea cable system after previously participating in similar ventures through consortiums. The cable will carry data at speeds exceeding 320 terabits per second. Amazon did not disclose construction costs but expects the system to begin operations in 2028. The company is burying the cable roughly one and a half meters deep across the ocean floor. Installers will bore a horizontal tunnel from shore to shore. Amazon has added protective steel wiring to guard against ship anchors and deliberate sabotage.

twitter_icon_large.pngfacebook_icon_large.png

Read more of this story at Slashdot.

External Content
Source RSS or Atom Feed
Feed Location https://rss.slashdot.org/Slashdot/slashdotMain
Feed Title Slashdot
Feed Link https://slashdot.org/
Feed Copyright Copyright Slashdot Media. All Rights Reserved.
Reply 0 comments