Article 71YGS A First for Military Nuclear Power: TRISO Fuel Arrives at Project Pele

A First for Military Nuclear Power: TRISO Fuel Arrives at Project Pele

by
Sonal Patel
from POWER Magazine on (#71YGS)

Project Pele, the Department of War's (DOW's) first-of-its-kind transportable nuclear microreactor prototype, has received its tri-structural isotropic (TRISO) particle fuel at Idaho National Laboratory (INL), where formal system testing is slated to begin as early as 2027. The fuel-manufactured by BWXT Technologies (BWXT) and shipped from its Lynchburg, Virginia, facility-represents the first TRISO microreactor fuel [...]

The post A First for Military Nuclear Power: TRISO Fuel Arrives at Project Pele appeared first on POWER Magazine.

pele-fuel-prep-1-bwxt.png

External Content
Source RSS or Atom Feed
Feed Location http://www.powermag.com/feed
Feed Title POWER Magazine
Feed Link https://www.powermag.com/
Reply 0 comments