Article 77E1R From 18 Forced Outages to Zero Missed Starts: How CPS Energy’s Arthur von Rosenberg Plant Rebuilt Its Reliability

From 18 Forced Outages to Zero Missed Starts: How CPS Energy’s Arthur von Rosenberg Plant Rebuilt Its Reliability

by
Aaron Larson
from POWER Magazine on (#77E1R)

A deliberate shift from reactive maintenance to a reliability-centered operating culture cut the 500-MW combined cycle plant's forced outage rate by 90%-and delivered perfect availability through Texas's

The post From 18 Forced Outages to Zero Missed Starts: How CPS Energy's Arthur von Rosenberg Plant Rebuilt Its Reliability appeared first on POWER Magazine.

splash-avr-power-plant-c.jpg

External Content
Source RSS or Atom Feed
Feed Location http://www.powermag.com/feed
Feed Title POWER Magazine
Feed Link https://www.powermag.com/
Reply 0 comments