Taro dump licence left out ‘pre-existing waste’
by from on (#3FY3P)

The province's verdict is in on whether the Taro industrial dump is full, and it contains a surprise: the site's approved capacity should have been higher to reflect 180,500 cubic metres of waste piled there before it got its licence.