Shoreline protection along Waterfront Trail could cost $6.8 million
by from on (#445TX)

A report going to councillors shows recommended measures include excavating the lower shoreline embankment to allow for appropriate slope protection
A report going to councillors shows recommended measures include excavating the lower shoreline embankment to allow for appropriate slope protection
Source | RSS or Atom Feed |
Feed Location | http://rss.metroland.com/9/article/hamilton |
Feed Title | |
Feed Link | http://rss.metroland.com/ |
Reply | 0 comments |