Shoreline protection along Waterfront Trail could cost $6.8 million
by from on (#445TX)

A report going to councillors shows recommended measures include excavating the lower shoreline embankment to allow for appropriate slope protection

A report going to councillors shows recommended measures include excavating the lower shoreline embankment to allow for appropriate slope protection
| Source | RSS or Atom Feed |
| Feed Location | http://rss.metroland.com/9/article/hamilton |
| Feed Title | |
| Feed Link | http://rss.metroland.com/ |
| Reply | 0 comments |