Article 47RK7 NRC Greenlights Final Rule Governing Nuclear Plant Mitigation of Severe Events

NRC Greenlights Final Rule Governing Nuclear Plant Mitigation of Severe Events

by
Sonal Patel
from POWER Magazine on (#47RK7)
Story Image

A final rule the Nuclear Regulatory Commission (NRC) plans to publish this spring to replace pivotal actions it issued after the Fukushima accident will require U.S. nuclear generators to ensure they can mitigate severe events at reactors within a two-year compliance timeframe.

More than three years after it was proposed, the NRC's five commissioners on Jan. 24 approved, with a 3-2 vote, the final "Mitigation of Beyond-Design-Basis Events(MBDBE)" rule (SECY-16-0142), and directed staff to publish it in the Federal Register over the next few months.

The final rule, which is based on years of lessons learned from the March 2011 accident at the Fukushima Daiichi plant in Japan, seeks to amend existing rules that establish regulatory requirements for nuclear power reactor applicants and licensees to mitigate "beyond-design-basis events." The NRC describes the technical term, "beyond-design-basis events," as "accident sequences that are possible but were not fully considered in the design process because they were judged to be too unlikely."

According to the NRC, the final MBDBE rule will apply more broadly than either the NRC's March 2013 Containment Venting Orderor the Mitigation Strategies Order, which it issued in March 2012. Once the final rule is effective, it will replace the two orders.

The NRC said the final rule will require U.S. commercial reactors to:

  • Maintain resources and procedures to cool a reactor's core and spent fuel pool, as well as preserve the reactor's containment, following an event that disables all of a site's normal and emergency A/C electrical power sources, as well as the site's ability to safely transfer heat to the environment.
  • Maintain equipment that can reliably measure spent fuel pool water levels following a severe event.
  • Preserve the resources needed to protect the core, containment, and spent fuel pool from external hazards.

Most nuclear plants will be required to comply with the planned final rule within two years and 30 days after it is published in the Federal Register. However, plants that are subject to the NRC's Containment Venting order will be required to comply with the rule within three years and 30 days of the rule's publication.

Final Rule's Long History

The Fukushima accident ensued after a large tsunami, caused by an 9.0-magnitude earthquake, inundated Tokyo Electric Power Co.'s Fukushima Daiichi nuclear power plant. At the plant, the tsunami was an estimated 14 meters high. The earthquake and tsunami disabled the majority of the external and internal electrical power systems at the Daiichi plant, leading to meltdowns and hydrogen explosions at Units 1, 2, and 3.

Recognizing that the "combination of severe events challenged the implementation of emergency plans and procedures," at Fukushima, and to prevent similar incidents at U.S. plants, the NRC almost immediately took action. Weeks after the disaster, the NRC established a senior-level task force-the "Near-Term Task Force" (NTTF)-to comb through the NRC's rules and processes, and to identify safety improvements. The July 2011 NTTF report that NRC staff sent to commissioners ultimately concluded that while the NRC's regulatory system served the NRC and the public well, safety and emergency preparedness enhancements were needed. It made 12 general recommendations, concluding that the NRC's layered defense strategies could be bolstered by including explicit mandates for beyond-design-basis events.

In August 2011, the commission ordered staff to engage with stakeholders to review and assess the NTTF recommendations holistically. After staff sent back their recommendations for near-term action in September 2011, the commission in October 2011 ordered staff to initiate rulemaking to address specific recommendations. Among them were rules to ensure nuclear plants maintain safety through a prolonged station blackout, that they enhance spent fuel makeup capability and instrumentation, and that they fortify onsite emergency response capabilities, such as emergency operating procedures, accident management guidelines, and extensive damage mitigation guidelines. Those regulatory actions ultimately evolved into the NRC's March 2012 pivotal orders laying out mitigation strategies for beyond-design-basis external events.

The Mitigation Strategies Order, issued on March 12, 2012, required all nuclear plants to have additional capability to mitigate severe events without their permanently installed A/C electrical power sources for an indefinite period of time-including to maintain or restore reactor core and spent fuel cooling, as well as to protect the reactor containment. On the same day, to address the spent fuel recommendation, the NRC also issued a separate order (the Spent Fuel Pool Instrumentation [SFPI] Order) requiring U.S. nuclear plants to have reliable indication of water level in their spent fuel pools.

However, as it developed the rules, staff recognized that consolidating the rulemaking-owing to inter-relationships among proposed changes-would be more efficient. In the months that followed, it issued multiple staff requirement memoranda calling for portions of their NTTF recommendations be consolidated. The MBDBE rule resulted from these efforts.

The MBDBE rule generally combines two NRC activities already published in the Federal Register-station blackout mitigation strategies(finalized in July 2013) and onsite emergency response capabilities(finalized in October 2013). But while the NRC issued the MBDBE proposed rule in November 2015, and a draft final rule in December 2016-and though it received only about 185 individual comments-it took the commission more than two years to approve the final rule.

A Markedly Different Rule

As three NRC commissioners-NRC Chair Kristine Svinicki and Commissioners Annie Caputo and David Wright-who voted as the majority noted on Thursday, "the final rule omits many provisions of the draft final rule; we did not arrive at this result lightly."

A key point of deliberation was whether the rule's requirements would comply with existing rules, specifically the Backfit Rule, which governs modification or additions to systems, structures, or designs at a facility. In the end, "we supported only those provisions for which such compliance was substantiated by the staff's analysis in the decision record," the commissioners voting with the majority said.

One of many other significant changes in the final rule is that it removes requirements to address seismic and flooding hazards that have been re-evaluated using more current information. As industry sources noted, in Fukushima's aftermath, the NRC asked licensees to evaluate seismic and flooding hazards at operator reactor sites, giving plants in the central and eastern U.S. 1.5 years and plants in the western U.S. three years to submit reports. In May 2014 and 2015, it then ordered 33 plants to perform seismic probabilistic risk assessments (SPRA) because their reevaluated hazard exceeded their current design basis. A revised schedule announced in October 2015 requires industry to complete those SPRAs by December 2019. In its final rule approved Thursday, the NRC generally agreed with generator comments that removing requirements to address seismic and flooding hazards would give them more flexibility in how they address flooding and earthquakes, including to protect equipment.

A Focus on Costs

The NRC suggests the final MBDBE rule could cost, in total, $7.2 million, "even though MBDBE requirements have largely been implemented prior to the effective date of the rule."

It means nuclear generators will spend $110,000 per site. According to the NRC's regulatory analysis of the rule, these costs, which it concluded are "justified," are mainly attached to licensee efforts to review the rule against previous efforts to implement mitigation strategies and spent fuel pool instrumentation orders. In comparison, the proposed rule would have cost about $1.7 million per site.

The rule may not be the end of the line as far as Fukushima rulemaking is concerned. On Thursday, commissioners voting as the majority noted that other work continues outside the rulemaking context: "there is some analysis to determine whether additional safety improvements are appropriate and further evaluation is ongoing of the actual risk posed by external hazards needed to make such determinations."

Mixed Reactions

The NRC's actions on Thursday immediately prompted mixed reactions.

The Union of Concerned Scientists, a national nonprofit organization that advocates for nuclear power-related public safety, lambasted the NRC's rule, calling it a "stripped-down version" of a 2016 draft final rule.

The group's contention was mainly with the NRC's decision to remove requirements to address seismic and flooding hazards. "After Fukushima, an NRC task force recommended that the NRC "order licensees to reevaluate the seismic and flooding hazards at their sites " and if necessary, update their design basis and SSCs [structures, systems and components] important to safety to protect against the updated hazards," it said.

"To date, the NRC has only implemented the first part of the recommendation: Owners have reevaluated seismic and flooding hazards. What they found is not reassuring. For instance, the flooding reevaluations revealed that roughly two-thirds of U.S nuclear plants face hazards beyond what they were originally designed to handle, including higher flood levels from extreme precipitation, upstream dam failure and storm surge. The reevaluated flood height for local intense precipitation for the Palisades plant in Michigan, for example, was more than 25 feet higher than the level considered in the plant's original design. Similar concerns were identified in many seismic risk evaluations."

The group added: "The commission majority's action today removed that requirement and will simply maintain the uncertain-and inadequate-status quo."

However, the Nuclear Energy Institute (NEI), a trade association of U.S. nuclear generators, said the NRC's decision affirmed that nuclear plants are well protected. "The U.S. commercial nuclear industry is recognized as the worldwide leader in nuclear operations because we have the safest nuclear fleet in the world. 'Safety First' is the driving force that has guided the industry to not only meet the Nuclear Regulatory Commission's safety regulations, but exceed them," said NEI president and CEO Maria Korsnick.

Korsnick added that nuclear plants are "designed to withstand the most severe hurricanes, earthquakes and other natural hazards as assessed by experts. After their construction, more than $4 billion in additional equipment was added to protect against even more extreme events that were 'beyond design basis,' " she noted.

Commissioners At Odds on Rule's Effectiveness

The comments largely echoed viewpoints published by the NRC's five commissioners in separate documents on Thursday.

Writing for the majority, Svinicki, Caputo, and Wright noted that in response to Fukushima, the NRC embarked on a "program of work" that has taken eight years, and involved a wide variety of people from the agency, from the regulated industry, and from interested stakeholders. "The Commission's action on this final rule provides a holistic conclusion to a large portion of this work, which has already resulted in undeniable safety improvements throughout the operating power reactor fleet in the United States," they said.

Commissioner Jeff Baran and Stephen Burns issued their own views. "I strongly support requiring these updated standards and critical safety improvements, which are necessary to provide adequate protection of public health and safety. But the majority of the Commission has decided to gut this key post-Fukushima safety rule," wrote Baran.

Burns mostly agreed, writing he is "chiefly concerned with the position the Commission majority has taken with respect to the reevaluated hazard analyses performed by licensees. This position is particularly disconcerting given that the accident at Fukushima was a direct result of the operator and regulator failing to take action to account for new scientific knowledge related to natural hazards, especially flooding hazards. In this regard, I believe that the majority has undermined the Commission's past position on these issues."

The issuance of the NRC's final rule "was meant to be the culmination of the agency's efforts to learn the lessons of the Fukushima Daiichi accident. Given the final form of the rule approved by the Commission majority, it will be difficult to convince others that the agency has learned those lessons well," he said.

-Sonal Patel is a POWER associate editor (@sonalcpatel, @POWERmagazine).

The post NRC Greenlights Final Rule Governing Nuclear Plant Mitigation of Severe Events appeared first on POWER Magazine.

External Content
Source RSS or Atom Feed
Feed Location http://www.powermag.com/feed
Feed Title POWER Magazine
Feed Link https://www.powermag.com/
Reply 0 comments