Article 4JCHB Red Hill paving on schedule

Red Hill paving on schedule

by
from on (#4JCHB)
Red%20Hill%20South%20Bd%20July%202_Conte

Repaving work on the south-bound Red Hill Valley Parkway is heading into the home stretch."We've paved a majority of the main line from the QEW to the Linc limits," said Gord McGuire, director of engineering services for the City of Hamilton. "Ou

External Content
Source RSS or Atom Feed
Feed Location http://rss.metroland.com/9/article/hamilton
Feed Title
Feed Link http://rss.metroland.com/
Reply 0 comments