Article 5TYMS Construction Paperwork For Dabaa NPP 3 And 4 Handed In

Construction Paperwork For Dabaa NPP 3 And 4 Handed In

by
Nuclear Street News
from News on (#5TYMS)
On December 30, 2021, ahead of schedule, Egyptian Nuclear Power Plant Authority (NPPA) handed over the package of documents to the Egyptian Nuclear and Radiological Regulatory Authority (ENRRA) which are required for receipt of license for construction of El Dabaa NPP power units 3 and 4 (general designer and general contractor is ROSATOM Engineering Division).(read more)aggbug?PostID=50977&AppID=34&AppType=Web
External Content
Source RSS or Atom Feed
Feed Location http://nuclearstreet.com/nuclear_power_industry_news/b/nuclear_power_news/rss.aspx
Feed Title News
Feed Link https://nuclearstreet.com/nuclear_power_industry_news/b/nuclear_power_news
Reply 0 comments