Burlington Canal Lift Bridge reopens after 2 months of maintenance work
by Bobby Hristova from CBC | Edmonton News on (#6A13W)
The Burlington Canal Lift Bridge on Eastport Drive reopened Monday after being closed for over two months.
The Burlington Canal Lift Bridge on Eastport Drive reopened Monday after being closed for over two months.
Source | RSS or Atom Feed |
Feed Location | http://rss.cbc.ca/lineup/canada-hamiltonnews.xml |
Feed Title | CBC | Edmonton News |
Feed Link | https://www.cbc.ca/news/canada/hamilton/?cmp=rss |
Feed Copyright | Copyright: (C) Canadian Broadcasting Corporation, http://www.cbc.ca/aboutcbc/discover/termsofuse.html#Rss |
Reply | 0 comments |