NASA Shutters $2B Satellite Refueling Project, Blames Contractor For Delays.
"NASA said Friday it is shutting down a $2 billion satellite refueling project," reports UPI, "after criticizing the project's contractor for poor performance."The agency in a statement said it will discontinue the On-orbit Servicing, Assembly and Manufacturing 1 project after nearly a decade of work due to "continued technical, cost, and schedule challenges, and a broader community evolution away from refueling unprepared spacecraft, which has led to a lack of a committed partner." [...] The spacecraft would have utilized an attached Space Infrastructure Dexterous Robot (SPIDER) to refuel the Landsat, assemble a communications antenna and demonstrate in-space manufacture of a 32-foot carbon fiber composite beam to verify the capability of constructing large spacecraft structures in orbit... An audit from NASA's Inspector General, however, found OSAM-1 was on track to exceed the projected $2.05 billion budget and would not make its December 2026 launch date, laying the blame on the "poor performance of Maxar." "NASA and Maxar officials acknowledged that Maxar underestimated the scope and complexity of the work, lacked full understanding of NASA technical requirements, and were deficient in necessary expertise," the report read. The report also noted Maxar was "no longer profiting from their work on OSAM-1," after which the xproject appeared not "to be a high priority for Maxar in terms of the quality of its staffing." Thanks to long-time Slashdot reader schwit1 for sharing the news.
Read more of this story at Slashdot.