Article 6M4WA OPG Embarks on Major Refurbishment of Niagara Falls Hydropower Stations

OPG Embarks on Major Refurbishment of Niagara Falls Hydropower Stations

by
Sonal Patel
from POWER Magazine on (#6M4WA)

Ontario Power Generation (OPG) will partner with GE Vernova to complete a 15-year project to refurbish the iconic 1.7-GW Sir Adam Beck I and II hydroelectric complex near Niagara Falls. [...]

The post OPG Embarks on Major Refurbishment of Niagara Falls Hydropower Stations appeared first on POWER Magazine.

sir-adam-beck-low-scaled.jpeg

External Content
Source RSS or Atom Feed
Feed Location http://www.powermag.com/feed
Feed Title POWER Magazine
Feed Link https://www.powermag.com/
Reply 0 comments