CNG Connects Fangchenggang Unit 1 -- First Of Six Planned -- To The Grid
China General Nuclear (NGC) announced that it had connected Fangchenggang Unit 1 to the grid Monday. The unit, which will undergo a 168-hour full power load test, is the first of six planned for the site. Construction of the CPR-1000 reactor, with an installed capacity of 1,080 megawatts of electricity...(read more)