by Contributed Content from POWER Magazine on (#7614X)
Installed utility-scale battery energy storage system (BESS) is expected to cross the 100-GW milestone this year, and yet no two utility-scale BESS installations are exactly alike. A 4-hour, fully integrated AC block LFP shifting 100 MW of Kern County sunshine, a 1-hour tier-2 air-cooled NMC tied to a dusty 5kV pole somewhere in West Nowhere, [...]The post BESS Needs to Be the Most Reliable Cornerstone of the Modern Grid-Analytics Can Help appeared first on POWER Magazine.