Article 3G4RQ Seattle Metro Rapid Transit Map “circa” 1990

Seattle Metro Rapid Transit Map “circa” 1990

by
Oran Viriyincy
from Seattle Transit Blog on (#3G4RQ)

39208036391_881de974ea_z.jpg?resize=640%

Fifty years ago this week, February 13, 1968, 50.8% of Greater Seattle voters voted yes to the Forward Thrust rapid transit proposition. The construction of a 49-mile rapid transit system modeled after BART and the Washington Metro needed voters to approve $385 million in general obligation bonds. The remainder of the $1.15 billion cost would be picked up by the federal government. Unfortunately, the state constitution requires a 60% majority to approve such a bond so the measure failed and the rest is history.

But for the sake of this post, let's assume it did pass and the system got built as planned. What would a Metro map look like? We've seen the scans of maps from the plans. What we've not seen is how the service would have operated. Here is a diagram I made that presents the Seattle Metro rapid transit system as if it were in operation in 1990, five years after completion of the initial system plan after several phased openings than began in 1976. I wanted to create a map with a 1970s design aesthetic but not clone the style of those iconic transit maps of the era.

Seattle-Metro-1990_8.5x11-348x450.png?re

click to enlarge

The plan outlines the physical route segments, named after the area they served but did not develop operating lines. There is enough information in the plan and its technical appendix that I can infer three primary rail lines. Note that the lines and their names are my creation.

  1. East-Northwest Line (Red) connecting Bellevue, Mercer Island, downtown Seattle, Belltown, Uptown, Interbay, and Ballard. It is much like East Link joined with the Ballard Green Line.
  2. South-Northeast Line (Blue) connecting the Boeing facilities in Renton and the Duwamish with downtown Seattle, South Lake Union, Capitol Hill, the northern part of the Central District, Madison Valley, the University District, Roosevelt, and Lake City. It is the north-south line that serves part of today's Link Red Line.
  3. Eastgate Line (Green) serving the Eastgate spur with trains coming from the Northwest and Northeast legs of the system during daytime hours.

The plan, for cost estimating purposes, assumed trains would operate 20 hours a day, 5 am to 1 am, every day, with closing time extended by an hour on Friday and Saturday nights. Hourly owl buses would connect all stations when rail service is closed.

The base daytime frequency on each line would be every 5-7.5 minutes. Rush hour frequency increases to every 4-5 minutes, meaning the core downtown segment between Jackson and Pine would see trains consisting of 6 or 8 cars arriving every 90 seconds. In the early morning and late evening periods frequency drops to every 10 minutes and the Eastgate Line does not operate.

Each rail car would be about 70 feet long and 10 feet wide with 3 doors on each side and wide aisles and seats for 74 passengers. Cars would be coupled in pairs to form trains of 2, 4, 6, or 8 cars. The trains would be electrically powered through a third rail and be capable of reaching a top speed of 75 mph. This is comparable to BART and Washington DC Metro rolling stock and train lengths.

The bus lines included on the map are:

  • West Seattle busway (Orange) providing an exclusive 2-lane pathway for buses between 35th & Avalon in West Seattle and a cross-platform bus-rail transfer at the Spokane station in SoDo. Buses from California Av, Delridge Wy, Admiral, Fauntleroy, Gatewood, 35th SW/Arbor Heights would use the busway to connect with rail.
  • Rainier Beach express bus line 21 (Silver) operating all-day every 10 minutes from Rainier Beach bus station to Duwamish station with less frequent service continuing north of Rainier Beach to Jackson Station in the International District.
  • SR 520 and I-405 express bus lines 60 and 66 (Silver) combined operates every 7.5 minutes during peak and every 15 minutes all-day from Northup Way station to Pacific station via SR 520. Line 60 continues to Bothell via I-405. Line 66 continues to North Redmond via SR 520.
  • Aurora express bus line 64 (Silver) feeds Crown Hill station with service from Richmond Highlands bus station every 4 minutes during peak and half-hourly until 7 pm on weekdays. The 47-Aurora bus provides local service half-hourly seven days a week.
  • Airport bus line (Gold), although not proposed to be frequent outside peak, provides a connection from Duwamish station to Sea-Tac Airport. The plan studied a southwest rail route branching from Duwamish station through either Burien or Riverton Heights but did not recommend it be constructed in the initial phase due to PSGC (now PSRC) plans then to construct a second regional airport and cap Sea-Tac airport to 20 million annual air passengers. It did make provisions for Duwamish station to handle such an extension in the future. One wonders how including an airport line from the beginning might have influenced voters.

I have changed some station names from their original plan names. The Boeing associated name of Plant II is changed to South Park for the bridge near it. University Hospital is changed to Pacific. Rainier changed to Judkins Park. Wedgewood is corrected to Wedgwood. Northrup Way is corrected to Northup Way. A provisional Wilburton station in the recommended East route and future Tukwila station on the South route was included.

For reference, I have produced a Google map of all the routes and stations in the plan with their projected opening dates.

?feed-stats-post-id=82072cpzEIakM27c
External Content
Source RSS or Atom Feed
Feed Location https://feeds.feedburner.com/seattletransitblog/rss
Feed Title Seattle Transit Blog
Feed Link https://seattletransitblog.com/
Reply 0 comments