Metro tweaks the 41 & 271 as “Seattle Squeeze” gets real
Metro is continuing to adjust routes and frequencies with the closure of the bus tunnel and, more recently, the Montlake freeway ramps.
Route 41, one of few routes with over 10,000 daily riders, was moved to surface streets and has been stuck using the punctuality-melting Stewart Street I-5 offramp ever since. In an effort to amputate the leg and save the patient, Metro has opted to send the 41 into downtown via Union Street starting July 27. This will eliminate stops at 7th & Stewart and 3rd and Pine in the southbound direction only - northbound is unchanged. Folks will have a longer walk in the AM (or a transfer) but should see a more reliable ride. The agency thinks it's worth the tradeoff:
Metro's planning and service quality teams surveyed riders and bus drivers and showed them the benefits and tradeoffs of the Union Street routing. A large majority (79 percent of riders surveyed and 94 percent of Route 41 bus drivers) supported having the faster travel times and better reliability with having to potentially travel farther between the new bus stops and their destination.
Route 271, the cross-lake superstar with over 5,000 daily riders, has only gotten more critical recently. Riders appear to be opting for Link-271 as an alternative to the 550, which is on long-term reroute as part of East Link construction. As of July 18 the 271 added 7 additional trips, 4 in the morning and 3 in the afternoon, to relieve the associated crowding.
Meanwhile Montlake Triangle construction is underway - streets are being widened for new bus bays on Montlake Boulevard, among other improvements. Buses won't start using the new lanes until March 2020.
Finally, SDOT has added new markings on 4th Avenue to give drivers more notice to clear out of the bus lane as the intersection approaches.