500-Mile-Long Power Line Hits a Roadblock: Ice Age Fossils

A proposal to build a nearly 500-mile-long stretch of transmission line in Nevada has been further delayed due to the discovery of possible fossil deposits in its path.
A proposal to build a nearly 500-mile-long stretch of transmission line in Nevada has been further delayed due to the discovery of possible fossil deposits in its path.
Source | RSS or Atom Feed |
Feed Location | http://gizmodo.com/rss |
Feed Title | Gizmodo |
Feed Link | https://gizmodo.com/ |
Reply | 0 comments |