500-Mile-Long Power Line Hits a Roadblock: Ice Age Fossils

A proposal to build a nearly 500-mile-long stretch of transmission line in Nevada has been further delayed due to the discovery of possible fossil deposits in its path.

A proposal to build a nearly 500-mile-long stretch of transmission line in Nevada has been further delayed due to the discovery of possible fossil deposits in its path.
| Source | RSS or Atom Feed |
| Feed Location | http://gizmodo.com/rss |
| Feed Title | Gizmodo |
| Feed Link | https://gizmodo.com/ |
| Reply | 0 comments |