Nvidia GB200 Rack Supply Chain Ramp Will Be a Few Months Slower
by Brian Wang from NextBigFuture.com on (#6T22A)
TrendForce projects that Nvidia GB200 Rack mass production and peak shipments are unlikely to occur until between Q2 and Q3 of 2025. This is largely due to the higher design specifications of the GB200 rack, including its requirements for high-speed interconnect interfaces and thermal design power (TDP), which significantly exceed market norms. The NVIDIA GB ...