Article 6T22A Nvidia GB200 Rack Supply Chain Ramp Will Be a Few Months Slower

Nvidia GB200 Rack Supply Chain Ramp Will Be a Few Months Slower

by
Brian Wang
from NextBigFuture.com on (#6T22A)
Story ImageTrendForce projects that Nvidia GB200 Rack mass production and peak shipments are unlikely to occur until between Q2 and Q3 of 2025. This is largely due to the higher design specifications of the GB200 rack, including its requirements for high-speed interconnect interfaces and thermal design power (TDP), which significantly exceed market norms. The NVIDIA GB ...

Read more

External Content
Source RSS or Atom Feed
Feed Location http://feeds.feedburner.com/blogspot/advancednano
Feed Title NextBigFuture.com
Feed Link https://www.nextbigfuture.com/
Reply 0 comments