Article 1JPZJ 3GPP sets 2018 as freeze date for 5G air interfaces

3GPP sets 2018 as freeze date for 5G air interfaces

by
from The Register on (#1JPZJ)
Story ImageLTE control plane will help ease carrier transition

The 3GPP has told the industry to get cracking on standardising the air interface for 5G."

External Content
Source RSS or Atom Feed
Feed Location http://www.theregister.co.uk/headlines.atom
Feed Title The Register
Feed Link https://www.theregister.com/
Feed Copyright Copyright © 2026, Situation Publishing
Reply 0 comments