Correction: future Link headways
by Martin H. Duke from Seattle Transit Blog on (#4MJBY)
In Friday's post, we quoted Metro's slide indicating more Link trains after 2021. Sound Transit says Metro did not check with them when announcing new train headways. It will remain every 6 minutes peak and 10 otherwise, with no trains turning around at Stadium. In 2023, it will be every 4 minutes peak and 5 off peak through downtown, with the South King and East King branches each getting 8 and 10. We regret the error.