737 Max "Designed by Clowns"; Boeing Suppliers Affected by Production Suspension
takyon writes:
Boeing: internal emails reveal chaos and incompetence at 737 Max factory
[On] Thursday hundreds of pages of internal messages were delivered to congressional investigators in which Boeing executives mocked their regulator, joked about safety and said the Max had been "designed by clowns".
Shocking as the emails are, they will come as no surprise to those following the Boeing story. Last month Edward Pierson, a former senior manager at Boeing's 737 factory in Renton, Washington, told Congress he had witnessed "chaos" at the factory where the Max was built and had warned management that "Boeing was prioritizing production speed over quality and safety". His warnings were ignored.
Boeing Mocked Lion Air Calls for More 737 Max Training Before Crash
Indonesia's Lion Air considered putting its pilots through simulator training before flying the Boeing Co. 737 Max but abandoned the idea after the planemaker convinced them in 2017 it was unnecessary, according to people familiar with the matter and internal company communications.
The next year, 189 people died when a Lion Air 737 Max plunged into the Java Sea, a disaster blamed in part on inadequate training and the crew's unfamiliarity with a new flight-control feature on the Max that malfunctioned.
[...] "Now friggin Lion Air might need a sim to fly the MAX, and maybe because of their own stupidity. I'm scrambling trying to figure out how to unscrew this now! idiots," one Boeing employee wrote in June 2017 text messages obtained by the company and released by the House committee.
In response, a Boeing colleague replied: "WHAT THE F%$&!!!! But their sister airline is already flying it!" That was an apparent reference to Malindo Air, the Malaysian-based carrier that was the first to fly the Max commercially.
Read more of this story at SoylentNews.