News Roundup: Lots of Things
WSBLE study results and new options (for the West Seattle and Ballard Link Extension). Public input until February 17.
ST2 Link openings scheduling. Staff are exploring the possibility of opening the East Link starter line without delaying Lynnwood Link's opening, a partial ST Express restructure with the starter line (no specific routes yet), and a Federal Way starter line" (opening Kent-Des Moines before Federal Way).
ST is seeking volunteers for its North King Community Oversight Panel. Seattle is seeking volunteers for its Move Seattle Levy Oversight panel.
VideosWhy it's hard to build good and inexpensive transit in the US. Two people asked me to post this RMTransit video about what drives quality down and costs up in projects that are built. Link is the first example at 1:47. Seattle's experience with Link Light Rail that has the costs of a subway system but the capacity and service quality of a light rail system should be instructive here." He says an automated system with smaller trains and higher frequency could have cost less, had higher reliability and better service, and attracted more riders. He goes on to list other US transit systems and issues. I hear a lot of diagnosing problems but not many concrete solutions, so that leaves me at a loss with what to do. Maybe I'm not understanding the video.
American cities with a combination of higher walkability and lower rents. (CityNerd)
Urban gondolas around the world. (RMTransit) The recent wave started with Mendellin's metrocable in 2004. Reece discusses which situations gondolas work well in.
Other NewsMetro's Lynnwood Link restructure open house registration. Scroll down to Community Engagement". Dates are February 4 and 27.
Seattle Comprehensive Plan virtual open house January 30.
Free transit passes are now available for Seattle low-income housing residents ($) and Climate Pledge Arena events ($).
Bus Doggy Doggs in Alaska ($).
The Federal Transportation Administration has a new grant fund for equity transit projects ($).
Amtrak Cascades has a survey for its long-range plan update. (Urbanist)
SDOT pats itself on the back for its best accomplishments in 2022.
RapidRide G (Madison) construction is 40% complete.
This is an open thread.