NRC Permit for Kairos Power Molten Salt Nuclear Reactor to be Built by 2027
by Brian Wang from NextBigFuture.com on (#6HAT2)
he U.S. Nuclear Regulatory Commission (NRC) has voted to issue a construction permit to Kairos Power for the Hermes demonstration molten salt nuclaer reactor to be built at the Heritage Center Industrial Park in Oak Ridge, Tennessee. The Kairos Power FHR (KP-FHR) is a novel advanced reactor technology that leverages TRISO fuel in pebble form ...