Article 6ZC6K AI Data Center Need Nuclear Power- Lots of It

AI Data Center Need Nuclear Power- Lots of It

by
Brian Wang
from NextBigFuture.com on (#6ZC6K)
The resurgence of nuclear energy is driven by the massive power demands of AI data centers. Needing 150 GW annually by 2030 with a 100 GW gap by 2028. This means adding all of the current power of the USA and Europe in the 2030s. Covering the U.S. Department of Energy's (DOE) initiative to fast-track ...

Read more

External Content
Source RSS or Atom Feed
Feed Location http://feeds.feedburner.com/blogspot/advancednano
Feed Title NextBigFuture.com
Feed Link https://www.nextbigfuture.com/
Reply 0 comments