Article 73959 NASA gears up for one more key test before launching Artemis II to the Moon

NASA gears up for one more key test before launching Artemis II to the Moon

by
Stephen Clark
from Ars Technica - All content on (#73959)

If all goes according to plan Monday, NASA's launch team at Kennedy Space Center in Florida will load 755,000 gallons of super-cold propellants into the rocket built to send the Artemis II mission toward the Moon.

The fuel loading is part of a simulated countdown for the Space Launch System rocket, a final opportunity for engineers to rehearse for the day NASA will send four astronauts on a nearly 10-day voyage around the far side of the Moon and back to Earth. The Artemis II mission will send humans farther from Earth than ever before. The astronauts will be the first to launch on NASA's SLS rocket and the first people to travel to the vicinity of the Moon in more than 53 years.

Charlie Blackwell-Thompson, NASA's launch director for the Artemis II mission, will supervise the practice countdown from a firing room inside the Launch Control Center a few miles away from the SLS rocket at Kennedy Space Center. In a recent briefing with reporters, she called the Wet Dress Rehearsal-"wet" refers to the loading of liquid propellants-the "best risk reduction test" for verifying all is ready to proceed into the real countdown.

Read full article

Comments

External Content
Source RSS or Atom Feed
Feed Location http://feeds.arstechnica.com/arstechnica/index
Feed Title Ars Technica - All content
Feed Link https://arstechnica.com/
Reply 0 comments